Installation and maintenance guide
1ZSC000563-AAB EN, REV. 6, 2019-09-12
45
Procedure with a flexible cable
1.
Clean the contact surfaces.
G006856
2.
Put a flexible cable (14) between the grounding
hole in the bushing flange and a grounding point
on the transformer.
G0051
16
3.
Apply a large quantity of Mobilgrease 28 to the bolt (13).
CAUTION!
The quality of the bolt is important, stainless steel of A4-80 quality is recommended.
NOTE!
Or use a lubricant similar to Mobilgrease 28.
4.
Install the bolt (13).
Torque
M12: 40 Nm
5.
Connect the other end of the flexible cable (14) to the transformer.
NOTE!
This makes an electrical connection between the bushing and keeping them at the same
potential.
End of instruction
Содержание GSBK 170
Страница 1: ...1ZSC000563 AAB EN REV 6 2019 09 12 Transformer bushing type GSBK Installation and maintenance guide ...
Страница 46: ...46 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Страница 52: ...52 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Страница 54: ...54 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Страница 62: ...62 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Страница 66: ...66 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Страница 70: ......
Страница 71: ......