Installation and maintenance guide
1ZSC000563-AAB EN, REV. 6, 2019-09-12
57
2.
Put the pull-through cord (12) through the
box-spanner (13).
NOTE!
The terminal on the pull-through cord
(12) has M8 threads.
G004924
3.
Apply Vaseline to the thread on the pull-through
cord (12), then connect it to the draw rod.
NOTE!
Or use a lubricant with equal properties
to Vaseline.
G0051
19
4.
Remove the M16 nut (10) on the draw rod with
the box spanner (13).
G005093
Содержание GSBK 170
Страница 1: ...1ZSC000563 AAB EN REV 6 2019 09 12 Transformer bushing type GSBK Installation and maintenance guide ...
Страница 46: ...46 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Страница 52: ...52 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Страница 54: ...54 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Страница 62: ...62 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Страница 66: ...66 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Страница 70: ......
Страница 71: ......