Installation and maintenance guide
1ZSC000563-AAB EN, REV. 6, 2019-09-12
29
Procedure
1.
If the bushing has the optional transport container
installed, remove it.
CAUTION!
Do not cause damage to the RIP-core
when removing the transport container.
G006350
2.
Put the pull-through cord (12) through the
box-spanner (13).
NOTE!
The terminal on the pull-through cord
(12) has M8 threads.
G004924
3.
Apply Vaseline to the threads on the pull-through
cord (12), then connect it to the upper draw rod.
NOTE!
Or use a lubricant with equal properties
to Vaseline.
G005092
Содержание GSBK 170
Страница 1: ...1ZSC000563 AAB EN REV 6 2019 09 12 Transformer bushing type GSBK Installation and maintenance guide ...
Страница 46: ...46 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Страница 52: ...52 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Страница 54: ...54 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Страница 62: ...62 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Страница 66: ...66 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Страница 70: ......
Страница 71: ......