1SDH000510R0001
27/28
Page N.
L2388
EP010
ABB SACE
4.
REVISION HISTORY
4.1
Revision a - 06/10/2004
First release for review.
4.2
Revision b - 17/11/2004
First release.
4.3
Revision c - 06/12/2004
4.3.1 Modified
Figure 1: swapped “A/-” with “B/+”
Table 2: swapped “A/-” with “B/+”.
4.4
Revision d - 21/12/2004
4.4.1 Added
Figure 5: added protective Earth connection.
4.4.2 Modified
Figure 1 and Table 2: changed “A/-” with “A” and “B/+” with “B”.
4.5
Revision e - 10/02/2005
4.5.1 Added
Par. 1.1: reference to ABB SACE documentation “GSD file, doc. n. ITSCE-RE1024001”
Par. 1.2: reference to ABB SACE documentation “GSD file, doc. n. ITSCE-RE1024001”
Table 14: rows 118 and 119 to complete a byte.
4.5.2 Modified
Par. 3.2.1.1: changed “Number of bytes: 14” with “Number of bytes: 15”.