Installation, operation and maintenance instructions
High voltage flameproof motors for explosive atmosphere
Control list 1 – General
Issued by: MOLM
Sheet No.
3AAM101028 E
Rev. B
Page 1 di 13
01.2023
W
e r
eserve
a
ll
rig
ht
s i
n t
hi
s
do
cument an
d in t
he
inf
orm
at
io
n
con
tai
n
e
d
the
rein.
R
epr
o
duct
ion
,
use of
di
sc
losu
re
t
o t
h
ird
par
tie
s
w
itho
ut
ex
pr
es
s aut
h
or
ity
is
st
ric
tly
for
bidd
en.
Customer
Machine type
Machine serial n°
Arrival date of the machine
Signature of
the consignee
DATE
SIGNATURE
Transport damage to motor and/or accessories
Yes
No
(In case of damage use control list 2)
Missing parts at delivery
Yes
No
(In case of missing parts use control list 3)
Motor storage period longer than 6 months
Yes
No
(In case of long storage use control list 4)
Mechanical installation: control list 5
Electrical installation: control list 6
Test run 1: control list 7
Test run 2: control list 8
Operational inspection: control list 9
Periodic maintenance: control list 10
Inside inspection: control list 11
Comments:
For record files
To
From
Date
Page
Issued by
Reg. n°
Continues on page