42/24-10 EN Rev. 9
Chapter 1: Preparing the Installation
1-1
Chapter 1
Preparing the Installation
Installation Location Requirements
Short Gas Paths
Install the gas analyzer as close as possible to the sampling location.
Locate the gas preparation and calibration assemblies as close as possible to the
gas analyzer.
Adequate Air
Circulation
Provide for adequate natural air circulation around the gas analyzer. Avoid heat
buildup.
When installing several system housings in a 19-inch rack, maintain a minimum
spacing of 1 rack unit between housings.
The entire surface of the system housing is used to dissipate heat.
Protection from
Adverse Conditions
Protect the gas analyzer from:
•
Cold
•
Direct sunlight and heat
•
Large temperature variations
•
Strong air currents
•
Accumulations of dust and dust infiltration
•
Corrosive atmospheres
•
Vibration (see “Vibrations”, page 1-2)
Air pressure range
600 to 1250 hPa
Relative humidity
max. 75 %
Environmental
Conditions
Ambient temperature range at storage and transport
–25 to +65 °C
Ambient temperature range during operation with
analyzer module
installed in a system housing
without electronics module
installed in a system housing
with electronics module or
with power supply only
Caldos25
+5 to +45°C
+5 to +45°C
Caldos27
+5 to +50°C
+5 to +45°C
Limas11
+5 to +45°C
+5 to +45°C
1)
Magnos206
+5 to +50°C
+5 to +45°C
Magnos27
+5 to +45°C
2)
+5 to +45°C
Uras26
+5 to +45°C
+5 to +40°C
Oxygen Sensor
+5 to +40°C
+5 to +40°C
1) +5 to +40°C when I/O modules are installed
2) +5 to +50°C for measurement chamber direct connection and installation in
system housing without electronics module or Uras26