92 Installation checklist
Cooling and driven equipment
Checks for cooling conditions and motor and driven equipment before start-up are listed
below.
The supply (input power) voltage cannot be applied to the output of the drive through a bypass
connection.
Motor connection box and other covers are in place.
The ambient operating conditions are allowable. (See
Losses, cooling data and noise
(page
(page
.)
The cooling air will flow freely. The protective covering is removed from the top of the drive module.
The motor and the driven equipment are ready for start. (See
Planning the electrical installation,
(page
Check
Содержание ACQ810
Страница 1: ...ABB industrial drives Hardware manual ACQ810 drive modules 200 to 400 kW 250 to 600 hp...
Страница 4: ......
Страница 16: ...16 Safety instructions...
Страница 30: ...30 Operation principle and hardware description...
Страница 69: ...Planning the electrical installation 69 Example circuit diagram See page 129...
Страница 70: ...70 Planning the electrical installation...
Страница 88: ...88 Electrical installation...
Страница 94: ...94 Start up...
Страница 96: ...96 Fault tracing...
Страница 122: ...122 Dimension drawings Frame without pedestal mm 64801082_3 6 E Center of gravity...
Страница 123: ...Dimension drawings 123 Frame with busbars on the left side mm 64801082_5 6 E...
Страница 124: ...124 Dimension drawings Drive control unit JCU Can be mounted on a DIN rail EN 50022 35 mm x 7 5 mm...
Страница 125: ...Dimension drawings 125 Package...
Страница 127: ...Dimension drawings 127 Frame with busbars on the left side inches 68440513_5 6 A 64801082 asm E...
Страница 128: ...128 Dimension drawings...
Страница 132: ...132 du dt filters and sine filters Sine filters Contact your local ABB representative...