Code and description
Cause
Measure
F04
(lock out error)
Ignition error
Three unsuccessful
ignition attempts.
No gas.
-
Make sure that the main gas supply
valve is open. If necessary, open the
valve.
-
Make sure that the manual gas supply
valve, before the gas control valve, is
open. If necessary, open the valve.
-
Make sure that the gas supply
pressure to the gas control valve is
correct, refer to Gas supply pressure
(see 8.9.3).
Air in the gas pipes.
-
Bleed the air out of the gas pipe.
-
Make sure that the gas supply
pressure to the gas control valve is
correct, refer to Gas supply pressure
(see 8.9.3).
Defect in the hot surface igniter circuit.
-
Make sure that the hot surface igniter
is installed correctly.
-
Make sure that the wiring of the hot
surface igniter is not damaged.
-
Measure the resistance across the hot
surface igniter. This must be between
the 36 and 72 Ohm (at room
temperature).
-
Make sure that the hot surface igniter
lights up during ignition.
If necessary, replace the hot surface igniter.
Defect in the ionisation circuit.
-
Make sure that the flame probe is
installed correctly.
-
Make sure that the wiring of the flame
probe is not damaged.
-
Measure the ionisation current. This
current must be a minimum of 3 μA
(parameter
109
).
If necessary, replace the wiring and/or
flame probe.
Supply voltage too low.
-
Make sure that the supply voltage on
the controller is correct.
-
If the supply voltage is below the
stated tolerance and the error
persists, contact your maintenance
and service engineer.
-
Install an isolating transformer.
Bent flame probe is in contact with
metal surface.
-
Make sure that the flame probe is not
bend.
-
If necessary, replace flame probe.
Ceramic part, of the flame probe, is
broken or cracked.
-
Make sure that the ceramic part of the
flame probe is not broken or cracked
in the vicinity of the burner.
-
If necessary, replace flame probe.
0312266_INNOVO_UKUK_
V5.1, 2022-07-12
77
Содержание Innovo IR 12-160
Страница 6: ...6 ...
Страница 13: ...User part 0312266_INNOVO_UKUK_V5 1 2022 07 12 13 ...
Страница 14: ...14 ...
Страница 16: ...16 User part ...
Страница 18: ...18 User part ...
Страница 24: ...24 User part ...
Страница 27: ...Installation Maintenance and Service part 0312266_INNOVO_UKUK_V5 1 2022 07 12 27 ...
Страница 28: ...28 User part ...
Страница 36: ...36 Installation Maintenance and Service part ...
Страница 56: ...56 Installation Maintenance and Service part ...
Страница 58: ...58 Installation Maintenance and Service part ...
Страница 70: ...70 Installation Maintenance and Service part ...
Страница 83: ...0312266_INNOVO_UKUK_V5 1 2022 07 12 83 ...
Страница 87: ...13 4 Electrical wiring diagram 0312266_INNOVO_UKUK_V5 1 2022 07 12 87 ...
Страница 89: ...13 5 Declaration of conformity 0312266_INNOVO_UKUK_V5 1 2022 07 12 89 ...
Страница 90: ......
Страница 91: ......
Страница 94: ...92 Installation Maintenance and Service part ...