Indication
Cause
Measure
Water leakage
There is a leakage from a threaded
water connection.
Tighten the threaded connection.
There is a condensate leakage
Make sure that the condensation water
discharge is working properly.
If necessary, correct the water discharge.
There is a leakage from another nearby
water heater or pipe segment.
Trace the leakage.
There is a leakage from the water heater
tank.
Contact the supplier of your water heater.
Explosive ignition
The gas supply pressure is incorrect.
Check the gas supply pressure, refer to Gas
supply pressure (see 8.9.3).
The CO
2
value is incorrect.
Check the CO
2
(see 8.9.4).
The burner is contaminated.
Clean the burner, refer to Gas-side
maintenance (see 11.4).
There is an air leakage between the
venturi and the flexible air connector.
Make sure that:
-
the flexible air connector is not
damaged.
If necessary, replace the flexible air
connector.
-
the flexible air connector is correctly
connected to the venturi.
If necessary, tighten the clamp.
Insufficient or no hot
water
The water heater is off.
Turn on the water heater (see 4.2).
There is no supply voltage.
Make sure that:
-
the control switch is set to I.
-
the isolator is in ON position.
-
there is power on the isolator.
-
there is power to the electrical
connector block.
The measured voltage must be
230 V
AC
(-15%, +10%).
The hot water supply is used up.
Reduce the hot water consumption. Wait
until the water heater heats up.
The controller is in the OFF mode.
Set the controller in the ON mode (see
4.2.1).
The temperature (T
set
) is set too low.
(see 4.2.2).
72
Installation, Maintenance and Service part
Содержание Innovo IR 12-160
Страница 6: ...6 ...
Страница 13: ...User part 0312266_INNOVO_UKUK_V5 1 2022 07 12 13 ...
Страница 14: ...14 ...
Страница 16: ...16 User part ...
Страница 18: ...18 User part ...
Страница 24: ...24 User part ...
Страница 27: ...Installation Maintenance and Service part 0312266_INNOVO_UKUK_V5 1 2022 07 12 27 ...
Страница 28: ...28 User part ...
Страница 36: ...36 Installation Maintenance and Service part ...
Страница 56: ...56 Installation Maintenance and Service part ...
Страница 58: ...58 Installation Maintenance and Service part ...
Страница 70: ...70 Installation Maintenance and Service part ...
Страница 83: ...0312266_INNOVO_UKUK_V5 1 2022 07 12 83 ...
Страница 87: ...13 4 Electrical wiring diagram 0312266_INNOVO_UKUK_V5 1 2022 07 12 87 ...
Страница 89: ...13 5 Declaration of conformity 0312266_INNOVO_UKUK_V5 1 2022 07 12 89 ...
Страница 90: ......
Страница 91: ......
Страница 94: ...92 Installation Maintenance and Service part ...