10. Disconnect the pressure gauge.
11. Reconnect the hoses of the air proving switch and the gas valve.
Fig. Air pressure differential
H
L
8.9.3
Gas supply pressure
Check the gas supply pressure:
1.
Loosen the sealing screw (4) of the test nipple by a few turns.
Note
Do not completely loosen the sealing screw, it can be difficult to retighten it.
2.
Open the gas supply to vent the gas pipes through the test nipple.
3.
Connect a pressure gauge to the test nipple as soon as you smell gas.
4.
Turn on the water heater (see 4.2).
5.
Set parameter
201
to
Hi
, refer to Settings (see 10).
6.
If necessary, create a heat demand:
-
Use a hot water draw-off point to tap water, or
-
Raise the setpoint of the water temperature, refer to Set the water temperature
(see 4.2.2).
7.
Wait about 1 minute.
8.
Use the pressure gauge to read the supply pressure and compare it with the value
from the appendix Gas details.
Note
Consult the mains gas supply company if the supply pressure is not correct. Take
the water heater out of service until the supply pressure is correct, refer to section
Decommissioning (see 8.10).
9.
Set parameter
201
to
dIS
10. Press [RESET]. The water heater goes into OFF mode.
11. Set the control switch on the side of the water heater to 0 to turn off the water
heater.
12. Shut off the gas supply.
n
n
0312266_INNOVO_UKUK_
V5.1, 2022-07-12
53
Содержание Innovo IR 12-160
Страница 6: ...6 ...
Страница 13: ...User part 0312266_INNOVO_UKUK_V5 1 2022 07 12 13 ...
Страница 14: ...14 ...
Страница 16: ...16 User part ...
Страница 18: ...18 User part ...
Страница 24: ...24 User part ...
Страница 27: ...Installation Maintenance and Service part 0312266_INNOVO_UKUK_V5 1 2022 07 12 27 ...
Страница 28: ...28 User part ...
Страница 36: ...36 Installation Maintenance and Service part ...
Страница 56: ...56 Installation Maintenance and Service part ...
Страница 58: ...58 Installation Maintenance and Service part ...
Страница 70: ...70 Installation Maintenance and Service part ...
Страница 83: ...0312266_INNOVO_UKUK_V5 1 2022 07 12 83 ...
Страница 87: ...13 4 Electrical wiring diagram 0312266_INNOVO_UKUK_V5 1 2022 07 12 87 ...
Страница 89: ...13 5 Declaration of conformity 0312266_INNOVO_UKUK_V5 1 2022 07 12 89 ...
Страница 90: ......
Страница 91: ......
Страница 94: ...92 Installation Maintenance and Service part ...