WARNING

CONDENSATE ALSO DRAINS FROM TWO LOCATIONS ON
THE BLOWER ASSEMBLY AS SHOWN IN FIGURE 5. A
CONDENSATE HOSE MUST BE SECURED TO FORM A "TRAP"
AS SHOWN IN FIGURE 5 FOR THESE CONDENSATE DRAIN
CONNECTIONS. THESE TWO HOSES MAY BE CONNECTED
TOGETHER. THE HOSE(S) SHOULD BE ROUTED TO A
SUITABLE DRAIN.

 A fitting that may be used to join the two hoses

from the blower assembly is included in a supplied kit.

FIGURE 5

3. Make sure that plastic tubing is still attached to the pressure

switch and fan housing.  Also make sure that wiring connector
from motor to control box is securely attached.

4. Do not plug in power cord until vent system is completely

installed.  The Power Vent operates on 110-120 Vac. therefore
a grounded outlet must be within reach of the 6 foot flexible
power cord supplied with the vent (see fig.1).  The power cord
supplied may be used on a unit only where local codes permit.
If local codes do not permit use of flexible power supply cord:

A. Make sure the unit is unplugged  from the wall outlet.

Remove the plastic top cap. Remove screws and open
panel on the front of the control box on the blower.

B. Cut the flexible power cord, leaving enough to be able to make

connections. Remove the strain relief fitting from the box.

C. Install a suitable conduit fitting inside the enclosure.

D. Splice field wiring into existing wiring using code authorized

method (wire nuts, etc).

E. Be certain that neutral and line connections are not

reversed when making these connections.

F.

Ground heater properly.  This water heater must be grounded
in accordance with the National Electrical Code NFPA 70
and/or local codes.  These must be followed in all cases.

The water heater must be connected to a grounded metal,
permanent wiring system; or an equipment grounding
conductor must be run with the circuit conductors and
connected to the equipment grounding terminal or lead on
the water heater, see Figure 7.

G. Close the panel on the control box. Make sure that the

access panel is secured shut.

5. The blower discharge boot is made to accept only straight sections

of 2" pipe.  To start off with an elbow, a short section of the furnished
pipe, a minimum of 2 inches, must be cut and glued into the end
of the elbow that will mount on the discharge boot.

INSTALLATION OF VENT SYSTEM

Before beginning installation of piping system thoroughly read
the section of this manual VENT PIPE PREPARATION.

If you are installing your system so that it vents through roof,
please refer to section  titled INSTALLATION OF VERTICAL VENT
SYSTEM.

VENT TERMINAL INSTALLATION, SIDEWALL

1. Install the vent terminal by using the cover plate as a template

to mark the hole for the vent pipe to pass through the wall.
BEWARE OF CONCEALED WIRING AND PIPING INSIDE
THE WALL.

2. If the Vent Terminal is being installed on the outside of a finished

wall, it may be easier to mark both the inside and outside wall.
Align the holes by drilling a hole through the center of the
template from the inside through to the outside.  The template
can now be positioned on the outside wall using the drilled
hole as a centering point for the template.

3. A)  MASONRY SIDE WALLS

Chisel an opening approximately one half inch larger than the
marked circle.

B)  WOODEN SIDE WALLS
Drill a pilot  hole approximately one quarter inch outside of the
marked circle. This pilot hole is used as a starting point for a
saws-all or sabre saw blade. Cut around the marked circle
staying approximately one quarter inch outside of the line. (This
will allow the vent to easily slide through the opening.  The
resulting gap will be covered up by the Vent Terminal cover
plate.) Repeat this step on inside wall if necessary.

SEQUENCE OF INSTALLATIONS, FIGURE 6

Cut a length of PVC pipe about 3.5 inches longer than the wall
thickness at the opening. Glue the vent terminal to this section of
pipe. Slide the wall plate over the pipe to stop against the vent
terminal. Place a bead of caulking (not supplied) around the gap
between the pipe and cover plate. Apply enough to fill some of
the gap between the pipe and wall. Place some of the caulking
on the back of the plate to hold it against the wall after installation.
If the vent pipe is installed up to the wall, with a coupling on the
end against the wall opening, the pipe with the vent terminal can
be prepared for gluing before inserting through the wall. Slide the
pipe through the wall and insert into the coupling on the other
side of the wall, making sure that the vent terminal ends up pointed
in the correct position, see Figure 6.

VENT TERMINATION - FIGURE 6

Содержание BTX-80

Страница 1: ...TAINS INFORMATION RELATIVE TO YOUR SAFETY PLEASE READ THOROUGHLY BEFORE INSTALLING AND USING THIS APPLIANCE MODEL BTX 80 COMMERCIAL GAS WATER HEATER Glass Lined Tank Type Water Heater GET TO KNOW YOUR...

Страница 2: ...0 50 189 Nat 4 00 0 99 120 60 5 All models Maximum Supply Pressure 14 inches W C 3 48kPa Minimum Supply Pressure Natural Gas 5 0 inches W C 1 24kPa Minimum Pressure must be maintained under both load...

Страница 3: ...of part numbers and descriptions Standard hardware items may be purchased locally A VENT PIPE B ANODE C HOT WATER OUTLET D OUTLET 120 VAC F GAS SUPPLY G MAIN MANUAL GAS SHUT OFF VALVE H GROUND JOINT...

Страница 4: ...suspected do not attempt to find the cause yourself Go to a neighbor s house leaving your doors open to ventilate the house then call your gas supplier or service agent Keep area clear until a servic...

Страница 5: ...arance of 24 should be allowed for blower assembly service Adequate clearance for servicing this appliance should be considered before installation such as changing the anodes etc Minimum clearances f...

Страница 6: ...or component s previously used with a non potable water heating appliance 4 When the system requires water for space heating at temperatures higher than required for domestic water purposes a temperi...

Страница 7: ...er heater With main burner in operation paint pipe joints including flanges and control inlet and outlet with rich soap and water solution Bubbles indicate gas leak To stop leak tighten flange screws...

Страница 8: ...pling or other restriction and must terminate near a suitable drain to prevent water damage during valve operation The discharge line shall be installed in a manner to allow complete drainage of both...

Страница 9: ...ng PVC Materials should useASTM D 2564 Grade Cement CPVC Materials should use ASTM F 493 Grade Cement and ABS Materials should use ASTM D 2235 Grade Cement If the water heater is being installed as a...

Страница 10: ...lued into the end of the elbow that will mount on the discharge boot INSTALLATION OF VENT SYSTEM Before beginning installation of piping system thoroughly read the section of this manual VENT PIPE PRE...

Страница 11: ...AUTION LABEL ALL WIRES PRIOR TO DISCONNECTION WHEN SERVICING CONTROLS WIRING ERRORS CAN CAUSE IMPROPER AND DANGEROUS OPERATION VERIFY PROPER OPERATION AFTER SERVICING POWER VENT WIRING SCHEMATIC FIGUR...

Страница 12: ...ION INSTALLATION OF VERTICAL VENT SYSTEM A proper flashing or BOOT should be used to seal the pipe where it exits the roof The total vent system should not exceed the equivalent feet of pipe as listed...

Страница 13: ...ir tight to prevent any combustion gases escaping into the room If the plug is not securely tightened remove and reinstall using Teflon tape on the threads Once installed along with the rest of the ve...

Страница 14: ...leaks will allow flue gas by products to disseminate into the room creating an unsafe environment and could cause illness asphyxiation and or even death FIGURE 12 Typical Installation for Vertical Ven...

Страница 15: ...0 pipe Never use all purpose cements commercial glues and adhesives or ABS cement to join PVC or CPVC pipe and fittings SAFETY PRECAUTION PRIMERS AND CEMENTS ARE EXTREMELY FLAMMABLE AND MUST NOT BE ST...

Страница 16: ...after it has hit the bottom of the fitting socket A good joint will have sufficient cement to make a bead all the way around the outside of the fitting hub The fitting will have a tendency to slide b...

Страница 17: ...PERATING smell all around the appliance area for gas Be sure to smell next to the floor because some gas is heavier than air and will settle on the floor WHAT TO DO IF YOU SMELL GAS Do not try to ligh...

Страница 18: ...E ACCESS It is recommended that lower water temperatures be used to avoid the risk of scalding It is further recommended in all cases that the water temperature be set for the lowest temperature which...

Страница 19: ...k in operating condition SERVICE SHOULD BE PERFORMED ONLY BY A QUALIFIED SERVICE TECHNICIAN READ THE GENERAL SAFETY INFORMATION SECTION FIRST USERS OF THIS APPLIANCE SHOULD BE AWARE THAT GAS COMPONENT...

Страница 20: ...r writing to us at A O Smith Water Products Company Service Department 500 Tennessee Waltz Parkway Ashland City TN 37015 1299 or going to our website at www hotwater com Please click on Contact us the...

Страница 21: ...afety water heater service should be performed only by a qualified service technician Read the GENERAL SAFETY INFORMATION section first WARNING DO NOT BY PASS ANY CONTROLS TO MAKE HEATER OPERATE OPERA...

Страница 22: ...cuit 1 Turn power to the water heater off for 10 seconds and then back on 2 Replace gas control valve Problem with the internal circuit 1 Turn power to the water heater off for 10 seconds and then bac...

Страница 23: ...nless an effective method of controlling thermal expansion is also installed at the heater s and operational at all times The relief valve installed on the heater is not an acceptable method 4 SERVICE...

Страница 24: ...24...