VENT PIPE PREPARATION

1.

INITIAL PREPARATION

A. Make sure the solvent cement you are planning to use is

designed for the specific application you are attempting.

B. Know the physical and chemical characteristics and limitations

of the PVC and CPVC piping materials that you are about to use.

C. Know the reputation of your manufacturer and their products.

D. Know your own qualifications or those of your contractor. The

solvent welding technique of joining PVC and CPVC pipe is a
specialized skill just as any other pipe fitting technique.

E. Closely supervise the installation and inspect the finished job

before start-up.

F. Contact the manufacturer, supplier, or competent consulting

agency if you have any questions about the application or
installation of PVC and CPVC pipe.

G. Take the time and effort to do a professional job. Shortcuts will

only cause you problems and delays in start-up. By far,  the
majority of failures in PVC and CPVC systems are the result
of shortcuts and/or improper joining techniques.

2.

SELECTION OF MATERIALS

Cutting Device - Saw or Pipe Cutter

Deburring Tool, Knife, File, or Beveling Machine (2" and above)

Brush - Pure Bristle

Rag - Cotton (Not Synthetic)

Primer and Cleaner

Solvent Cement - PVC for PVC Components and CPVC for
CPVC Components

Containers - Metal or Glass to hold Primer and Cement.  Select
the type of PVC or CPVC materials to be used on the basis of
their application with respect to chemical resistance, pressure
rating, temperature characteristics, etc.

Insertion Tool - Helpful for larger diameter pipe and fittings
(6" and above).

PRIMER

It is recommended that Tetrahydrofuran (THF) be used to prepare
the surfaces of pipe and fittings for solvent welding. Do not use
water, rags, gasoline or any other substitutes for cleaning PVC or
CPVC Surfaces.  A chemical cleaner such as MEK may be used.

CEMENT

The cement should be a bodied cement of approximately 500 to
1600 centipoise viscosity containing 10-20% (by weight) virgin
PVC material solvated with tetrahydrofuran (THF). Small quantities
of dimethyl formamide (DMF) may be included to act as a retarding
agent to extend curing time.  Select the proper cement; Schedule
40 cement should be used for Schedule 40 pipe. Never use all-
purpose cements, commercial glues and adhesives or ABS
cement to join PVC or CPVC pipe and fittings.

SAFETY PRECAUTION: PRIMERS AND CEMENTS ARE
EXTREMELY FLAMMABLE, AND MUST NOT BE STORED OR
USED NEAR HEAT OR OPEN FLAME.  ALSO, USE ONLY IN A
WELL-VENTILATED AREA.

APPLICATORS

Select a suitable pure bristle type paint brush. Use a proper width
brush or roller to apply the primer and cement . Speedy application
of cement is important due to its fast drying characteristics.
IMPORTANT NOTE: A dauber type applicator should only be used

on pipe sizes 2" and below. For larger diameter pipe, a brush or
roller must be used.

3.

MAKING THE JOINT

A. Cutting

Pipe must be squarely cut to allow for the proper interfacing of
the pipe end and the fitting socket bottom. This can be
accomplished with a miter box saw or wheel type cutter. Wheel
type cutters are not generally recommended for larger diameters
since they tend to flare the corner of the pipe end. If this type of
cutter is used, the flare on the end must be completely removed.

                             

STEP A

NOTE:

Power saws should be specifically designed to cut
plastic pipe.

B. Deburring

Use a knife, plastic pipe deburring tool, or file to remove
burrs from the end of small diameter pipe. Be sure to remove
all burrs from around the inside as well as the outside of the
pipe. A slight chamfer (bevel) of about 10°-15° should be
added to the end to permit easier insertion of the pipe into
the end of the fitting. Failure to chamfer the edge of the
pipe may remove cement from the fitting socket, causing
the joint to leak.

                    

STEP B

C

.

 Test dry fit of the joint

Tapered fitting sockets are designed so that an interference fit
should occur when the pipe is inserted about 1/3 to 2/3 of the
way into the socket. Occasionally, when pipe fitting dimensions
are at the tolerance extremes, it will be possible to fully insert
dry pipe to the bottom of the fitting socket. When this happens,
a sufficient quantity of cement must be applied to the joint to
fill the gap between the pipe and fitting. The gap must be filled
to obtain a strong, leak-free joint.

D. Inspection, cleaning, priming

Visually inspect the inside of the pipe and fitting sockets and
remove all dirt, grease or moisture with a clean dry rag. If wiping
fails to clean the surfaces, a chemical cleaner must be used.
Check for possible damage such as splits or cracks and replace
if necessary.

Содержание BTX-80

Страница 1: ...TAINS INFORMATION RELATIVE TO YOUR SAFETY PLEASE READ THOROUGHLY BEFORE INSTALLING AND USING THIS APPLIANCE MODEL BTX 80 COMMERCIAL GAS WATER HEATER Glass Lined Tank Type Water Heater GET TO KNOW YOUR...

Страница 2: ...0 50 189 Nat 4 00 0 99 120 60 5 All models Maximum Supply Pressure 14 inches W C 3 48kPa Minimum Supply Pressure Natural Gas 5 0 inches W C 1 24kPa Minimum Pressure must be maintained under both load...

Страница 3: ...of part numbers and descriptions Standard hardware items may be purchased locally A VENT PIPE B ANODE C HOT WATER OUTLET D OUTLET 120 VAC F GAS SUPPLY G MAIN MANUAL GAS SHUT OFF VALVE H GROUND JOINT...

Страница 4: ...suspected do not attempt to find the cause yourself Go to a neighbor s house leaving your doors open to ventilate the house then call your gas supplier or service agent Keep area clear until a servic...

Страница 5: ...arance of 24 should be allowed for blower assembly service Adequate clearance for servicing this appliance should be considered before installation such as changing the anodes etc Minimum clearances f...

Страница 6: ...or component s previously used with a non potable water heating appliance 4 When the system requires water for space heating at temperatures higher than required for domestic water purposes a temperi...

Страница 7: ...er heater With main burner in operation paint pipe joints including flanges and control inlet and outlet with rich soap and water solution Bubbles indicate gas leak To stop leak tighten flange screws...

Страница 8: ...pling or other restriction and must terminate near a suitable drain to prevent water damage during valve operation The discharge line shall be installed in a manner to allow complete drainage of both...

Страница 9: ...ng PVC Materials should useASTM D 2564 Grade Cement CPVC Materials should use ASTM F 493 Grade Cement and ABS Materials should use ASTM D 2235 Grade Cement If the water heater is being installed as a...

Страница 10: ...lued into the end of the elbow that will mount on the discharge boot INSTALLATION OF VENT SYSTEM Before beginning installation of piping system thoroughly read the section of this manual VENT PIPE PRE...

Страница 11: ...AUTION LABEL ALL WIRES PRIOR TO DISCONNECTION WHEN SERVICING CONTROLS WIRING ERRORS CAN CAUSE IMPROPER AND DANGEROUS OPERATION VERIFY PROPER OPERATION AFTER SERVICING POWER VENT WIRING SCHEMATIC FIGUR...

Страница 12: ...ION INSTALLATION OF VERTICAL VENT SYSTEM A proper flashing or BOOT should be used to seal the pipe where it exits the roof The total vent system should not exceed the equivalent feet of pipe as listed...

Страница 13: ...ir tight to prevent any combustion gases escaping into the room If the plug is not securely tightened remove and reinstall using Teflon tape on the threads Once installed along with the rest of the ve...

Страница 14: ...leaks will allow flue gas by products to disseminate into the room creating an unsafe environment and could cause illness asphyxiation and or even death FIGURE 12 Typical Installation for Vertical Ven...

Страница 15: ...0 pipe Never use all purpose cements commercial glues and adhesives or ABS cement to join PVC or CPVC pipe and fittings SAFETY PRECAUTION PRIMERS AND CEMENTS ARE EXTREMELY FLAMMABLE AND MUST NOT BE ST...

Страница 16: ...after it has hit the bottom of the fitting socket A good joint will have sufficient cement to make a bead all the way around the outside of the fitting hub The fitting will have a tendency to slide b...

Страница 17: ...PERATING smell all around the appliance area for gas Be sure to smell next to the floor because some gas is heavier than air and will settle on the floor WHAT TO DO IF YOU SMELL GAS Do not try to ligh...

Страница 18: ...E ACCESS It is recommended that lower water temperatures be used to avoid the risk of scalding It is further recommended in all cases that the water temperature be set for the lowest temperature which...

Страница 19: ...k in operating condition SERVICE SHOULD BE PERFORMED ONLY BY A QUALIFIED SERVICE TECHNICIAN READ THE GENERAL SAFETY INFORMATION SECTION FIRST USERS OF THIS APPLIANCE SHOULD BE AWARE THAT GAS COMPONENT...

Страница 20: ...r writing to us at A O Smith Water Products Company Service Department 500 Tennessee Waltz Parkway Ashland City TN 37015 1299 or going to our website at www hotwater com Please click on Contact us the...

Страница 21: ...afety water heater service should be performed only by a qualified service technician Read the GENERAL SAFETY INFORMATION section first WARNING DO NOT BY PASS ANY CONTROLS TO MAKE HEATER OPERATE OPERA...

Страница 22: ...cuit 1 Turn power to the water heater off for 10 seconds and then back on 2 Replace gas control valve Problem with the internal circuit 1 Turn power to the water heater off for 10 seconds and then bac...

Страница 23: ...nless an effective method of controlling thermal expansion is also installed at the heater s and operational at all times The relief valve installed on the heater is not an acceptable method 4 SERVICE...

Страница 24: ...24...

Отзывы: