![9dot NCORE Скачать руководство пользователя страница 23](http://html1.mh-extra.com/html/9dot/ncore/ncore_manual_3067331023.webp)
23
NCORE MANUAL
VER. 2 REV. 1
Installation
Setup
Remove the drawer covers to be used.
Insert the power supplies into the slots provided until they click into place.
You will hear the locking tab click, which will be pressed again to remove the ACDC module. (The DCDC has no
tabs, but it is secured in place with the screw on the removed covers.)
Then attach the chassis to the cabinet or to the wall.
If you want to fix the NCore to the wall, you can rotate the fixing tabs 90 °, keeping it vertical as in the following figure.
ATTENTION: The weight of the NCore revolves around 16 Kg in the full configuration, so it is a weight to consider.
ATTENTION: Use only the parts provided, the use of unsuitable screws can cause irreparable damage.
Secure modules in place with screws holding the slot covers to prevent accidental extraction.
Before turning on the device, it is recommended to connect the power and signal cables, in particular:
ACDC 110 / 230V mains power cables, with VDE female connector IEC C13 standard IEC 60320 (cable not
included).
Battery cable (only if it is planned to connect it).
Turn the switch to activate the battery charger circuit.
Possible cable for battery module thermistor.
Wires to connect the devices to the ports.
Ethernet cable.
IMPORTANT NOTES:
Do not force the modules, remove them and try to reinsert them.
If it is not aligned, the rear connector of the module could be damaged.
Insert the battery cable firmly until it clicks.
Place the end of the thermistor in contact with the battery.
Figure 11 - NCore with fixing tabs at 90 °
Содержание NCORE
Страница 1: ...1 NCORE MANUAL VER 2 REV 1...