3M
™
Advanced Systems Tester 900AST Series
13
Power Down Timeout
To change the power down timeout, press the
key from the startup screen, then select Power Down
Timeout. Use the
and
arrow keys to select
the desired timeout period, then press the
key
to set that period as the default. After a period of
inactivity equal to the default period, the unit will
beep, then automatically power down to preserve
battery life.
Edit Custom Cable
This function allows you to create custom cable
types for specific applications.
Select one of the six available customizable cables
(Custom 1 through Custom 6) to edit. Use the
key to move between temperature, resistance, velocity
factor, and the label field. Use the
and
Содержание 900AST Series
Страница 1: ...Advanced Systems Tester 900AST Series Instruction Manual March 2005 78 8135 2559 5 E ...
Страница 2: ......