4-1
4
Installing the Firewall
Preparations
z
Before installing the firewall, make sure that you have read through Chapter 3 “Preparing the
Installation.”
z
Make sure all the requirements mentioned in Chapter 3 “Preparing the Installation” are satisfied.
Installation Flowchart
Figure 4-1
Installation flowchart for the F5000-A5
Start
Install the firewall to the
specified position
Connect the PGND cable
Connect the power cables
Connect the firewall to a
configuration terminal
Verify the installation
Turn on the power switch
Troubleshoot
Turn off the power switch
Is the power supply
normal?
Connect the firewall to an
Ethernet network
Connect the firewall to a WAN
Verify the installation
End
No
Yes
Select and install LPUs
Installing the Firewall in a Rack
Install the firewall after you have completed the installation preparations.