78
C
HAPTER
5: D
IAGNOSTICS
AND
T
ROUBLESHOOTING
5 On the transmitting PC:
a
From the
Select
menu on the main screen, select the NIC
to be tested.
b
From the
Test
menu, select
Test Setup
.
c
Select
Group 1
, and click
Disable Group
.
d
Select
Group 2
, and click
Disable Group
.
e
Enable the Transmit/Receive test by selecting
Group 3
,
selecting
Transmit/Receive Test
, and pressing the spacebar.
f
Enter the number of times you want the test to run, or
select
Continuous
.
g
Click
OK
.
The main screen reappears.
h
From the
Test
menu, select
Run Tests
.
The Test Results screen appears.
i
Click
Start
.
The test results are updated on the screen as the test runs.
Running the Echo Server Test
The Echo Server Test checks connectivity of the entire
system by verifying the ability of the 3C985B-SX server NIC
to send and receive echo packets. to run the Echo Server
Test, two PCs with 3C985B-SX server NICs installed are
required: one PC to send data and one PC to respond.
CAUTION:
Running the Echo Server Test while connected
to an active network can cause intermittent failures. To
avoid this, connect to an inactive network on which only
the PC being tested is operating.
To run the Echo Server Test, follow these steps:
1 Make sure that a 3C985B-SX server NIC is installed in
the sending PC and connected to the network.
2 Install a 3C985B-SX server NIC in another PC (the
responder) and connect it to the network.
Book Page 78 Monday, June 7, 1999 2:14 PM
Содержание EtherLink 3C985B-SX
Страница 1: ......
Страница 9: ......
Страница 15: ......
Страница 26: ...Creating a Load Balancing RSL and VLAN Configuration 25 Figure 4 Creating a Load Balancing RSL Group ...
Страница 29: ...28 CHAPTER 3 INSTALLING AND CONFIGURING THE WINDOWS NT DRIVER Figure 6 Creating a VLAN ...
Страница 91: ......
Страница 107: ......
Страница 113: ......