66
C
HAPTER
5: D
IAGNOSTICS
AND
T
ROUBLESHOOTING
To run the transmit/receive test:
1 Install a 3C985B-SX server NIC and the network driver
in each of two different servers and connect both to
the same inactive network.
The server that contains the NIC being tested is the
transmitting server
. The echo server is the
receiving server
.
You must start the test on the receiving PC before starting
the test on the transmitting PC.
2 On both servers:
a
Start the 3Com NIC Diagnostics program.
b
Click the Diagnostics tab to display the Diagnostics
window (
Figure 18
).
c
Click
Choose
Test
to display the Packet Test window
(
Figure 19
).
3 On the receiving server:
a
In the Packet Test window, click
Receive
to display the
Receiver window (
Figure 22
). (The option to run the test
continuously or for a certain number of iterations is
determined by configuring the transmitting PC. You
cannot modify the selection here.)
b
Click
Start
.
4 On the transmitting server:
a
In the Packet Test window, click
Transmit
to display the
Transmitter window.
b
To run the test continuously, click the
Continuous
check
box, or enter the number of times you want the test to
run by typing the number in the Loops field.
c
Click
Start
.
5 If you have selected
Continuous
, click
Stop
on the
transmitting server, and then click
Stop
on the
receiving server to halt the test.
6 To exit the Transmit/Receive Test, click
Close
.
Book Page 66 Monday, June 7, 1999 2:14 PM
Содержание EtherLink 3C985B-SX
Страница 1: ......
Страница 9: ......
Страница 15: ......
Страница 26: ...Creating a Load Balancing RSL and VLAN Configuration 25 Figure 4 Creating a Load Balancing RSL Group ...
Страница 29: ...28 CHAPTER 3 INSTALLING AND CONFIGURING THE WINDOWS NT DRIVER Figure 6 Creating a VLAN ...
Страница 91: ......
Страница 107: ......
Страница 113: ......