3Com Switch 7750 Series
Command Reference Guide – PoE
Chapter 1 PoE Configuration Commands
1-15
Note:
z
The
full
mode is used only when you cannot use the
refresh
mode.
z
When the PSE processing software is damaged (that is, all the PoE commands
cannot be successfully executed), you can use the
full
mode to update and restore
the software.
z
When the upgrade procedure is interrupted for some unexpected reasons (such as
failure which cause restart), if the update in the
full
mode fails after restart, you must
update the software in the
full
mode after power-off and restart of the device, and
then restart the device manually. In this way, the former PoE configuration is
restored.
Example
# Update the processing software in the PSE online.
<3Com>system-view
System View: return to User View with Ctrl+Z.
[3Com] poe upgrade refresh 0400_001.S19 slot 2
This will update poe file on board 2. Continue? [Y/N] y
Board 2 upgrading poe, please wait...
Load finished!
Start Upgrading...
Frame 0 IO Board 2 upgrade POE Pse succeeded
Содержание 7750 Series
Страница 520: ...3Com Switch 7750 Series Command Reference Guide Multicast Table of Contents iii 5 1 22 static rp 5 20 ...
Страница 808: ...3Com Switch 7750 Series Command Reference Guide ACL Chapter 1 ACL Commands 1 27 3Com time range test from 0 0 2000 1 1 ...
Страница 1177: ...3Com Switch 7750 Series Command Reference Guide Command Index Appendix A Command Indexx A 45 ...