456
C
HAPTER
22: F
ILE
S
YSTEM
M
ANAGEMENT
Device Management
With the device management function, the Switch can display the current running
state and event debugging information about the unit, thereby implementing the
maintenance and management of the state and communication of the physical
devices. In addition, there is a command available for rebooting the system, when
some function failure occurs.
The device management configuration task is simple. As far as a user is
concerned, it is mainly to display and debug the device management.
Device Management
Configuration
Rebooting the Switch
It is necessary to reboot the Switch when failure occurs.
Perform the following configuration in User View.
Table 501
Reboot the Switch
Enabling the Timing Reboot Function
After enabling the timing reboot function on the Switch, the Switch will be
rebooted at the specified time.
Perform the following configuration in User View, and the
display schedule
reboot
command can be performed in any view.
Table 502
Reboot the Switch
Designating the APP Adopted when Booting the Switch Next Time
In the case that there are several APPs in the Flash Memory, you can use this
command to designate the APP adopted when booting the Switch next time.
Perform the following configuration in User View.
Table 503
Designate the APP Adopted when Booting the Switch Next Time
Operation
Command
Reboot the Switch
reboot [ unit
unit-id
]
Operation
Command
Enable the timing reboot function of the
Switch, and set specified time and date
schedule reboot at
hh:mm
[
yyyy/mm/dd
]
Enable the timing reboot function of the
Switch, and set waiting time
schedule reboot delay {
hhh:mm
|
mmm
}
Cancel the parameter configuration of timing
reboot function of the Switch
undo schedule reboot
Check the parameter configuration of the
reboot terminal service of the current Switch
display schedule reboot
Operation
Command
Designate the APP adopted when booting the
Switch next time
boot boot-loader
file-url
Содержание 5500 SI - Switch - Stackable
Страница 24: ...24 ABOUT THIS GUIDE...
Страница 30: ...30 CHAPTER 1 GETTING STARTED Figure 3 Setting up a New Connection Figure 4 Configuring the Port for Connection...
Страница 50: ...50 CHAPTER 1 GETTING STARTED...
Страница 54: ...54 CHAPTER 2 ADDRESS MANAGEMENT CONFIGURATION...
Страница 78: ...78 CHAPTER 3 PORT OPERATION...
Страница 88: ...88 CHAPTER 4 XRN CONFIGURATION...
Страница 122: ...122 CHAPTER 8 VLAN VPN CONFIGURATION...
Страница 216: ...216 CHAPTER 15 SSH TERMINAL SERVICES...
Страница 268: ...268 CHAPTER 16 IP ROUTING PROTOCOL OPERATION...
Страница 308: ...308 CHAPTER 17 NETWORK PROTOCOL OPERATION...
Страница 349: ...349...
Страница 350: ...350 CHAPTER 18 MULTICAST PROTOCOL...
Страница 522: ...522 CHAPTER 22 FILE SYSTEM MANAGEMENT...
Страница 584: ...584 CHAPTER 30 PASSWORD CONTROL CONFIGURATION OPERATIONS...
Страница 600: ...600 CHAPTER 31 MSDP CONFIGURATION...
Страница 614: ...614 CHAPTER 32 CLUSTERING...
Страница 670: ...670 CHAPTER C AUTHENTICATING THE SWITCH 5500 WITH CISCO SECURE ACS...