background image

FV746   Rev. A   11/10/20

Page 2    

Using a flat head screwdriver, 

turning counterclockwise, flush 

supply line by opening the 

control stop.  Turning clockwise 

will close the control stop.

2 Gallon

1.

 

Install control stop assembly by threading it onto water supply 

pipe and tightening with a smooth jawed wrench.  Apply thread 

sealing compound or pipe tape to male NPT thread on sweat 

solder adapter only.

  Prior to turning on main water supply line ensure all stop valves 

are closed off tight by using a flathead screwdriver and turning 

the stop valve adjustment screw clockwise

.

2. When all stop valves are properly connected to the water 

supply line and water pressure is available, open the control 

stop using a flat head screwdriver and turning the stop valve 

adjustment screw counterclockwise.

  Allow the water supply line to flush any debris or sediment that 

may be present in the line. Close the control stop once the 

lines are completely flushed.

Control Stop Installation Instructions

Flush Valve 

Tailpiece

Locking Nut

Control Stop

O-Ring Groove

Snap Ring

Prior to attaching flush valve tailpiece to control stop, inspect and 

verify that the O-ring seal is located within the O-ring groove at 

the tailpiece.  Ensure that the locking nut and locking snap ring 

are also present on the tailpiece. 

Flush Valve Installation Instructions

Lubricate O-ring with water if necessary and insert flush valve 

tailpiece into the control stop valve. Tighten locking nut using a 

smooth jawed wrench.

Vacuum Breaker

Tube Nut

Spud Nut

Slip Gasket

Rubber Gasket

Spud Escutcheon

 -C-L- Indicator

Determine the length of vacuum breaker tube required to join the 

flush valve and fixture spud, and cut if necessary. 
Slide the tube nut, spud nut, slip gasket, rubber gasket and 

spud escutcheon over the vacuum breaker tube and insert tube 

into fixture spud.  Hand tighten tube nut to valve body and hand 

tighten spud nut onto fixture spud. Adjust the valve assembly for 

plumb. Tighten fixture spud nut, vacuum breaker tube nut and 

locking nut with a wrench. 

Adjust and plumb the valve assembly. Tighten all connections 

with smooth jawed wrench and turn on water supply at the control 

stop.

 

DO NOT

 cut vacuum breaker tube shorter than 6” below 

the -C-L- indicator mark, as vacuum breaker must be 6” above 

the fixture. Consult plumbing Codes & Regulations for specific 

details.

Vacuum Breaker & Flush Connection Installation Instructions

Summary of Contents for AquaSense ZER-W2 Series

Page 1: ... and use the purchaser shall determine the suitability of the product for his intended use and the purchaser assumes all risk and liability whatever in connection therewith Where permitted by law the implied warranty of merchantability is expressly excluded If the products sold hereunder are consumer products the implied warranty of merchantability is limited to a period of three years and shall b...

Page 2: ...mmunications However there is no guarantee that interference will not occur in a particular installation If this equipment does cause harmful interference to radio or television reception which can be determined by turning the equipment off and on the user is encouraged to try to correct the interference by one or more of the following measures Reorient or relocate the receiving antenna Increase t...

Page 3: ...r than this measurement Deburr by chamfering O D and I D of end of water supply pipe NOTE Before installation turn off water supplies to existing fixture and remove flushometer if replacing an existing device Finished Wall Water Supply Pipe Center Line of Fixture Spud 11 4 Sweat Solder Adapter Set Screw Chrome Cover Tube Wall Escutcheon Distance to Measure 2 Slide threaded sweat solder adapter ont...

Page 4: ... to control stop inspect and verify that the O ring seal is located within the O ring groove at the tailpiece Ensure that the locking nut and locking snap ring are also present on the tailpiece Flush Valve Installation Instructions Lubricate O ring with water if necessary and insert flush valve tailpiece into the control stop valve Tighten locking nut using a smooth jawed wrench Vacuum Breaker Tub...

Page 5: ...e adjustment of the activation distance see Appendix A Adjusting Your E Z Flush The E Z Flush unit has a 10 minute start up sequence in which the Object Lock Sensor will flash the User In View yellow L E D continuously as long as a user is in view After the start up sequence is completed and when the Object Lock Sensor has a user in view the User In View yellow L E D will flash only 3 times after ...

Page 6: ... valve shown on the right 3 Replace the plastic cover and main body cover without reinstall ing the working parts 4 Open the stop valve by using the stop adjusting screw and flush out all debris from pipe and connections 5 Shut stop open cover reinstall the working parts replace both covers and tighten This procedure should also be repeated when the system is drained for seasonal use as occurs in ...

Page 7: ...esired activation distance 6 Use sensor adjustor tool and turn Distance Adjustment Screw all the way down and then turn slowly up until yellow L E D begins to flash 7 Ensure Object Lock Sensor is not detecting stall door or wall by closing door stepping out of sensor path and making sure yellow L E D is not flashing If sensor locks onto door or wall unit will not flush properly Shorten activation ...

Page 8: ...faces such as metal weaken the signal between the gateway and other devices The LoRa antenna is an omni directional antenna but for best results mount the device so the LoRa antenna is in a vertical position near the top of a wall We recommend conducting a site survey to test the signal strength in different locations before you mount the device Step 4 Mounting the Zurn Gateway The device ships wi...

Page 9: ...eries are dead Replace batteries If the E Z Flush does not begin to function call Cus tomer Service at 1 800 997 3876 Flush Valve Trouble Shooting Guide Problem Corrective Action Status Good posted in plumbSMART and faucet actuation event data not appearing in plumbSMART 2 hours or Device Not Communicating warning or severe alert posted in plumbSMART for all devices 3 hours Step 1 Verify gateway S...

Page 10: ...aucet actuator electronics Restore proper electrical connection as needed Step 2 Test activate the faucet If problem persists see Faucet Troubleshooting section in this guide for other steps Status Good posted in plumbSMART and faucet actuates but usage event data not appearing in plumbSMART Charts Step 1 Verify gateway is powered and LoRa Status LED is ON If not apply power per Zurn Gateway Insta...

Page 11: ...t 1 0 gal flush P6000 EUA WS1 Water Saving Urinal Kit 1 5 gal flush P6000 EUA WS Full Flush Urinal Kit 3 0 gal flush P6000 EUA FF Repair Parts Inside Parts Product No Urinal Relief Valve Item 12 P6000 EU13 Closet Relief Valve Item 12 P6000 EC13 Flush Connections and Spud Coupling Kits Product No Flush Tube Assembly for Flush Valves Includes Items 15 19 Specify Diameter and Length P6000 A Vacuum Br...

Page 12: ...STRIES LLC 511 W Freshwater Way Milwaukee WI U S A 53204 Ph 1 855 ONE ZURN Fax 919 775 3541 In Canada ZURN INDUSTRIES LIMITED 7900 Goreway Drive Unit 10 Brampton Ontario L6T 5W6 Ph 905 405 8272 Fax 905 405 1292 Rev A Date 11 10 20 C N No NEW Prod Dwg No FV746 ...

Reviews: