40
Program Screens
The Zonex software provides 6 tabbed screens for System status and configuration. If you are installing
ZonexCommander (Plus)
to control multiple
zoned units, your software is equipped with 7 tabs:
Welcome Tab
Use to connect to the system.
Review Tab
Display total number of thermostats and devices, along with current space and heat/cool setpoint temperatures.
Schedule Tab
Assign Occupied and Unoccupied events for each thermostat and
RLYCOM
in the system.
Set Temp Tab
Enter Occupied and Unoccupied, Heat and Cool temperatures remotely for selected thermostats.
System Tab
To access or set the Day, Date, and Time – display Outside air on all systems, Mixed air (return) and Leaving air (supply)
temperature warning alert and temperature trending.
Vacation Tab
Assign up to 20 vacation/holiday events for each thermostat and
RLYCOM
.
Zoned Units Tab
Used only with
ZonexCommander (Plus)
, allocates thermostats to their respective units when multiple units are included in the system.
SYSTEM START-UP PROCEDURE
COMMON GROUND PHASING PROCEDURES
1. With the
ModStats
powered up, set voltmeter to the AC scale.
2. Separate the thermostat circuit board and cover from the terminal
base.
3. Place one meter probe on the RX terminal and the other probe on the
R terminal - note the voltage reading.
4. Keeping one probe on RX, place the other meter probe on terminal C
and note the voltage reading.
5. The lowest voltage reading must be on the RX to C terminals.
6. If the low voltage reading is measured on RX to R, reverse the R and
C wires on the thermostat terminal base.
7. If erratic voltages are read, contact Technical Support.
temperatures on SYSTEMS TAB – Number of thermostats and devices (
RLYCOM
) – Override for Occupied / Unoccupied
modes – Enter names or tags for thermostats and other devices – Thermostat lock feature –