4
SK2959
For
installation,
maintenance,
troubleshooting
and
service
checklist,
please
refer
to
the corresponding Pump Installation Manual and Replacement Parts List.
SK301
1
1 1/2 SCH 40 PVC PIPE X 10" (254 mm) LG. (ALL
MODELS)
1-1/2 SCH 40 PVC
TEE
NOTE: CHECK V
AL
VE SCREWS INT
O
PRIMAR
Y PUMP
DISCHARGE.
HAND-TIGHTEN ONL
Y.
WEEP
HOLE MUST
BE
VISIBLE.
FLOA
T SWITCH
DC PUMP
M53 OR M98 PRIMAR
Y PUMP
TYPICAL
INST
ALLA
TION
EXPLODED VIEW OF PUMP
SYSTEM
OUTLET
PUMP
PRIMAR
Y
1" (25 mm) MIN.
IMPOR
TANT
: OFF LEVEL
OF
FLOA
T ASSEMBL
Y
MUST
BE HIGHER
THAN
DC BACKUP
PUMP
DC PUMP
INST
ALLED IN LINE WITH SUBMERSIBLE PUMP
BA
TTER
Y BOX
DC CHARGER
OUTLET
CHARGER
R
R
FIGURE 1
FIGURE 2
© Copyright 2016 Zoeller
®
Co. All rights reserved.