Appendix A: ZP wiring guide
126
ZP3 Fire Control Panel Installation, Commissioning, and Maintenance Manual
For MICC cable, earth must be continuous at each connection or junction, in
accordance with BS specification BS 5839 Part 1 (paragraph 24.5), and the
Ì
ó
Ì
Ï
ô
Î
ô
Û
Í
Ú
Ð
Ì
ñ
Ï
Ë
(BS 7671).
ÿ
!
"
1
2
1. Control Unit
2. Isolators
ÿ
#
$
%
1
2
1. ZP Panel
2. Shield connected through
Summary of Contents for ZP3
Page 163: ......