Zip Hydroboil Plus- Installation & Operating Instructions - 85680 - February 2004
b) Standard 220-240 volt power cable positioned as shown on the
paper mounting template for connection from the rear of the heater to the
terminal block within the heater, OR a standard 10 amp 220-240 volt
power outlet on the wall within 1500 mm of the heater. For units with 3.6
Kw element (25 ltr) or multi element units (40 ltr) an isolating switch in the
fixed wiring and attached to a secure surface is required.
This switch must provide all-pole disconnection and a contact seperation of
at least 3 mm installed in accordance with wiring rules.
c) Cold water supply with a minimum working pressure of 100 kPa and a
maximum working pressure of 700 kPa connected via an isolation valve.
d) Outlet drainage to a sink draining board or to a drip tray.
e) Access to drainage from a vent situated at the base of the heater.
If the water pressure is likely to exceed 700 kPa, a 350 kPa pressure
reducing valve must be installed in the cold water supply line.
f)
In all installation instances the walls of the heater must be vertical and the
base horizontal, there can be no exceptions to this rule.
Installation Requirements
Continued