Zip Hydroboil Plus - Installation & Operating Instructions - 85680 - February 2004
Page 5 of 16
3.0 Litre models
12.5 kg
5.0 Litre models
16.5 kg
7.5 Litre models
20.5 kg
COLD
INLET
VENT
OUTLET
INLET
POSITION
VENT
POSITION
250mm
Wiring
Concealed
Vent
Concealed
Inlet
45 mm
45 mm
Approximate Weight When Filled
Installation Procedures
Before You Begin
Locate the paper mounting-hole template packed with the heater.
Read the installation and operating instructions completely.
Decide whether to install with concealed or exposed plumbing and/or electrical
connections. Concealed connections are preferred for superior appearance.
Step 1 – Positioning
Position the heater so the tap will drain on to a draining board or drip tray.
Position the base of the tap to be not less than 200 mm above the draining
board (height should be increased only if essential for filling larger vessels).
Provide clearance for service access of not less than 150 mm top, 65 mm left,
20 mm right.
Mark corner positions for the heater on the wall so as to position the paper
mounting-hole template.
Step 2 – Fastening
Position mounting-hole template on wall and drill holes where shown.
Drill holes for water inlet, vent outlet and wiring if rear access is intended.
Remove cover fastening screws from heater and lift whole cover off heater.
Detach both nozzles from base of heater by removing fastening screws.
Install plumbing and wiring and prepare pipe ends and wiring ends as shown.
Screw heater chassis to the wall using screws or bolts suited to the wall.
Screws or bolts must be capable of supporting the heater weight when filled.
(See table to the left).
Step 3 – Connectinga) Plumbing
Connect cold water inlet pipe from base of heater to 15 mm-to-quarter-
inch reducing bush (supplied) and then connect filtration system as instructed
below.
Important precaution:- All cold water inlet pipes must be flushed before
connection to avoid the risk of the heater clogging due to sediment or
metal fines.