Zip Hydroboil Plus - Installation & Operating Instructions - 85680 - February 2004
Page 7 of 16
Check previous steps. Turn water supply ON, check connections for leaks.
Push tap paddle inwards until water flows, release to stop flow of water.
Turn power ON. After a short period, boiling water will be available and will be
maintained close to boiling point thereafter. Initial heating periods are:
Warning: this appliance must be earthed.
Inlet water temperature
15°C
10°C
3.0 Litre models
16 minutes
17 minutes
5.0 Litre models
16 minutes
17 minutes
7.5 Litre models
23 minutes
24 minutes
d) Electrical
For concealed electrical connection, connect a power cable through the rear
access opening of the heater to the terminal block within the heater as shown.
For exposed electrical connection, connect the flex and plug (fitted to the
heater) to a standard 15 amp 220-240 volt power outlet on the wall within
1500 mm of the heater.
Do not turn the power ON until the heater is filled with water.
Step 4 – Assembling
Place the heater case back on to the heater and secure the top 2 case screws.
Place outlet nozzles on nozzle fascias at base of the heater and secure screws.
Secure two bottom case screws.
Step 5 – Commissioning
Installation Procedures
continued