Installation & Operation  •  5

INSTALLATION & OpERATION

Cases should be set to allow a minimum 3" of space behind the back of the units. This will allow necessary air to circulate behind the 

display cases and prevent condensation. Higher humidity stores with minimal air circulation require at least a 4" gap. A minimum 2" gap is 

recommended between cases on end-to-end installations. All minimum spacing requirements may increase if seismic restraints are used.

Moving Cases

Various tools and equipment may be used to move cases, including, but not limited to, a forklift, a Johnson bar, a pallet jack, furniture rollers, 

casters, or a Rol-A-Lift. Be careful to avoid damaging the store flooring. Only certified forklift drivers should use forklifts to move the cases. The 

case should only be lifted off the floor as high as necessary for transport. The forklift should be driven slowly; avoid abrupt motions or bumps.

 

ƒ

use the end frame to push/pull the case. For best results, push/pull lower on the end frame. 

Do not push/pull on the mullions as this 

can cause the mullions to bend.

 

 

ƒ

 When using a Johnson bar, only contact the sheet metal of the bottom foamed panel. 

Do not contact the bumper support. Be careful 

not to pierce the sheet metal with the corner of the Johnson bar.

 

ƒ

 When using a pallet jack or furniture rollers, only place them under the floor panels. 

Do not place them under the bumper support or 

drain pipe as that will crush the components.

 

ƒ

Cases have steel protective support plates under the end panels (not under insulated dividers) to protect them from Johnson bar damage.

Make sure that a forklift with the proper fork dimensions is available. 

Forks must be 48" long, 1 1/2" to 1 3/4" thick, and no more than 4" 

wide to fit the bases.

 Refer to the table below for instructions.

CASE MODELS

INSTRUCTIONS

2RVLC30

Forks must extend 26" to 30" under the case from either end

3RVLC30

Forks must extend 39" to 43" under the case from either end

4RVLC30

Forks must extend 44" to 47" under the case from either end

5RVLC30

Forks must extend 44" to 47" under the case from either end

Back-to-Back cases are shipped with wood planks that allow the use of pipe rollers. These wood planks should be removed after the case is 

moved to its final location.

OPTIONAL BASES

For low shipping height applications, Zero Zone has optional expandable bases to accommodate up to 1 3/4" thick forks (

See Figure 2

). To use 

a forklift on cases with expandable bases, raise the case with a Johnson bar and place wooden blocks under the case, allowing the base to 

expand enough for forks to be inserted.

If a case needs to move through an 80" door opening, the case will be factory-installed with a 1" base or a 1 3/4" base and will be shipped on a 

wooden pallet. Remove the case from the pallet to slide the case through the 80" doorway. The drain elbow will be shipped loose and must be 

installed using extra thick PVC cement after the case is through the doorway. The base will be set into a nested base (

See Figure 3)

.

 FIGURE 2: Expandable Base

 FIGURE 3: Nested Base

Summary of Contents for CRYSTAL MERCHANDISER RVLC

Page 1: ...COMPLIANT 66 0025 REV G Jun 2022 ZERO ZONE CRYSTAL MERCHANDISER FREEZERS RVLC With CoolView Doors and ChillBrite LED Lighting INSTALLATION OPERATION MANUAL...

Page 2: ...Installing a Door 17 Reversing Door Swing 17 Shelves Stocking Product 19 REFRIGERATION 20 Mechanical Components 20 Evaporator Coil 20 Evaporator Fans 20 Expansion Valve 20 Refrigerant Piping 20 Leak...

Page 3: ...all not be covered by this warranty Extended Warranties In addition to the standard limited warranty for further consideration the Seller will extend to the original purchaser prior to shipment a limi...

Page 4: ...n technicians If any questions or problems arise call Zero Zone at 800 247 4496 Any change to a Zero Zone product made during the installation start up or at any other time must be submitted in writin...

Page 5: ...Approved AHRI 1200 Performance Rating of Commercial Refrigerated Display Merchandisers and Storage Cabinets ANSI Approved DOE Compliant All U S Sales and U S Territories ASHRAE Standard 72 specifies t...

Page 6: ...eup will be labeled on the left end The numbers on each end to be joined will match as indicated See Figure 1 Back to Back cases have a side A and a side B The first case in a lineup with the right si...

Page 7: ...t will crush the components Cases have steel protective support plates under the end panels not under insulated dividers to protect them from Johnson bar damage Make sure that a forklift with the prop...

Page 8: ...of all joints both front and back 4 Using a laser level or transit find the highest point along both base position lines Using the high point as a reference mark the difference directly on the floor...

Page 9: ...at channel rails Figure 7 Hat Channel Rail Orientation Figure 8 Tape Shims on the Floor Under Each Base or Hat Channel Rail Case Front Case Front Placement Under Bases Case Front Case Front Placement...

Page 10: ...30 4RVLC30 5RVLC30 Drawings are top views with bases shown under the case The front of the case is toward the bottom of the page Case length does not include end panels 2 1 2 wide each Back of Case Fr...

Page 11: ...9 Installation Operation Figure 11 RVLC30BB Back to Back Base Locations 2RVLC30BB 3RVLC30BB 4RVLC30BB 5RVLC30BB Drawings are top views with bases shown under the case Case length does not include end...

Page 12: ...o offset the forward lean of a fully loaded case We recommend an additional 3 8 of shims be installed under the front bases after the case is leveled See Figure 13 Figure 13 Tilt Back Add 3 8 of shims...

Page 13: ...any bases or hat channel rails with gaps taller than one shim Do not place shims between bases and hat channel rails Note Total height of shims should be less than 3 4 Lineup Assembly Zero Zone displ...

Page 14: ...e are located 7 in from the joining holes The interior case seams must be sealed using silicone sealant for NSF compliance See Figure 17 on page 14 Do not allow Butyl caulk and silicone sealant to con...

Page 15: ...RLY SEALED SURFACES TO BE CAULKED MUST BE CLEAN DRY FREE OF TAPE ADHESIVE AND FREE OF FROST ABOVE 40 F Note Apply Butyl caulk to only one case not both cases The caulk will spread out when the cases a...

Page 16: ...hat squeezes out of the case joint Butyl caulk and silicone sealant will not mix which affects the adhesion of both See Figure 16 on page 13 1 Apply silicone based sealant in small continuous beads wh...

Page 17: ...float that turns the pump on when there is a sufficient liquid level Liquid is pumped through a plastic hose through a check valve and into the condensate evaporation pan The evaporation pan is equipp...

Page 18: ...eezers the torque adjuster must be moved by turning the sag adjustment screw 1 Open the door to gain access to the sag adjustment screw on the bottom of the hinge side of the door See Figure 22 2 Use...

Page 19: ...he weight of the door 5 Lift the door clear of the torque adjuster and set it down carefully Note For safety lift the door by the rails do not lift by the handle INSTALLING A DOOR 1 Lift the door and...

Page 20: ...nge pin cover and bolts on the opposite side of the door and then install the new hinge pin bracket using those bolts c Plug the wire harness into the new hinge pin Tape the hinge pin cover on the opp...

Page 21: ...llows an air curtain on top of the product Product should not extend beyond the front of the shelves or bottom wire rack Do not exceed shelf load capacity See Figure 33 Ice merchandiser load limit is...

Page 22: ...for superheat setting if using high glide refrigerants Cases connected to a condensing unit should use the higher superheat setting to minimize the chance of liquid flood back To adjust the TXV remov...

Page 23: ...ases will be equipped with a liquid line filter drier by default Leak Check Evacuation Charging After all of the refrigeration piping and system components have been assembled the entire system must b...

Page 24: ...ies with the defrost heaters Unless the installer rewires the defrost thermostat the defrost heater is de energized when defrosting is complete SETTING FROZEN FOOD ICE CREAM Defrost Type Electric Hot...

Page 25: ...ining clips The heater is fastened to the floor on the right hand side of the coil The electric wire leads are connected in a raceway under the coil cover on the right hand side of the case To replace...

Page 26: ...typically 12 22 minutes Hot gas defrost termination sensors are located on the TXV bypass line dump line HOT GAS DEFROST COMPONENTS See Figure 40 for defrost components Freezers equipped for hot gas...

Page 27: ...ipped loose and should be installed in the warmest product location as required by NSF Specific field installation instructions are packaged with the NSF thermometer Anti Sweat Heaters All mullions ar...

Page 28: ...fer to the wiring diagram shipped with the case External wiring should be sized according to the amperage rating stamped on the serial tag which is located on the ceiling inside the left hand door Typ...

Page 29: ...Electrical 27 Electrical Figure 42 Sample Wiring Diagram for Electric Defrost SAMPLE Figure 43 Sample Wiring Diagram for Hot Gas Defrost SAMPLE...

Page 30: ...cleaner Cleaning interior glass reduces fogging and increases visibility Do not use any cleaning products containing silicon for anti fog door coating 5 Internal components can be cleaned after remov...

Page 31: ...2022 Zero Zone Inc All Rights Reserved Jun 2022 For other technical support please refer to the Technical Resources page at WWW ZERO ZONE COM or contact the Zero Zone Service Department at 800 247 44...

Reviews: