Installation & Operation • 11
INSTALLATION & OpERATION
9. When joining a Crystal
™
freezer to a Crystal
™
cooler, both cases should be tilted back with an additional 3/16" of shims under the front
bases after the case is leveled. When joining multiple freezers and coolers in a lineup, the tilt back on the coolers should gradually increase
while working away from the cooler/freezer joint until the last case has an additional 3/8" of shims under the front base and the tilt back on
the freezers should gradually decrease to no additional shims while working away from the cooler/freezer joint (
10. Place additional support shims under any bases or hat channel rails with gaps taller than one shim. Do not place shims between bases
and hat channel rails.
Note: Total height of shims should be less than 3/4".
Lineup Assembly
Zero Zone display cases have been designed for continuous display so that multiple cases may be joined together to create a lineup of any
desired length. The lineup will be ready for assembly after removing the packaging material.
A case lineup must be properly aligned, which starts with properly leveling the case (
). It is crucial to use a laser
level to measure the high points in the floor and properly shim each base location.
FIGURE 14: Cooler to Freezer Leveling
Freezer
Cooler
Multiple Freezers
Multiple Coolers
Place shims under each base.
Place shims under each base.
Place shims under each base.
Place shims under each base.