ZEP SYSTEM I INSTALLATION MANUAL
Copyright © 2012 Zep Solar, Inc.
PAGE 26 OF 50
4.9 - STEP 9: Grounding
9-A: Insert a Ground Zep into the module.
Grounding as soon as the first module
is installed ensures that the array is
grounded during installation for tech-
nician safety.
Insert the Ground Zep into the module
groove with the set screw at the 9
o’clock position.
9-B: Lock the Ground Zep into place.
Rotate the Ground Zep 1/4 turn clock-
wise using the Zep Tool.
9-C: Connect the Ground Zep to the building ground.
Connect the Ground Zep to the build-
ing ground. Torque set screw as fol-
lows:
• 14-10AWG: 40 inch-lbs.
• 8AWG:
45 inch-lbs.
• 6AWG:
50 inch-lbs.
Summary of Contents for Zep System I
Page 1: ...VERSION 1 4 ...