![Zepro ZS 150-135 Installation Instruction Download Page 27](http://html1.mh-extra.com/html/zepro/zs-150-135/zs-150-135_installation-instruction_3478291027.webp)
27
ZS/ZSS/ZD-150/200/250
Pict 2
4. Slider installation
General
The ZS sliders with single folding platforms and ZD sli-
ders with double folding platforms are identical except
for the addition of a roll arm on the ZD models to aid
the folding out of the platform. The roll arm is installed
at the factory.
These slider lifts are premounted to a great extent at
the factory. The work to be carried out before the lift
can function is limited to :
1) attaching lift to the vehicle chassis,
2) attaching the platform
3) connecting the lift battery cable + cabin
switch
4) installing the control units
Installing the slider frame
The installation is very simple if you follow the
instructions for the positioning of the slider profiles
in section 4. The slide profile mounting brackets are
screwed into the outside of the truck chassis frame
as on a standard lift installation
(see pict 2)
. The first
bolt in each bracket should be bolted through the
slot thus allowing subsequent adjustment
(see pict
1)
.
Holes for the other bolts must be drilled after
the final position adjustment is made
, this is after
test running the lift and platform. Bottom of the slider
frames should be in alignment with bottom of vehicle
frame.
Pict 1