![Zepro ZS 150-135 Installation Instruction Download Page 24](http://html1.mh-extra.com/html/zepro/zs-150-135/zs-150-135_installation-instruction_3478291024.webp)
24
4. Slider installation
k)
The position of the mounting brackets in
the slide profiles when the platform is raised to the
vehicle floor level and touches the rear edge of the
floor ready for loading or unloading is known as the
working position
.
j)
However, when the platform is raised to
the bed height it is not next to the bed and must be
moved forward to the working position. The distance
between the folding position and the working posi-
tion is shown here.
i)
When the lift has been slid completely out
to the end of the slide profiles and the platform is
folded out, the position of the mounting brackets in
the slide profiles is known as the
folding position
.
h)
On this page diagrams show sliding lifts in-
stalled with their slide profiles installed in the recom
-
mended position for short overhang model as far
back as possible on the vehicle frames.
Differance between
folding position and
working position.
Geometry of sliding lift installation