![Zepro ZS 150-135 Installation Instruction Download Page 25](http://html1.mh-extra.com/html/zepro/zs-150-135/zs-150-135_installation-instruction_3478291025.webp)
25
165 - 400
min 1200, max 1300
10-15
110 - 150
ZT/ZTS-150/200/250
Suitable for installation on
the following distances
4. Slider installation
If the stop at the slide profile rear end not is the
same as platform- body, then you have to mount a
working position lock (art. no. 56280) so the distance
between platform and body is correct.
After installation and load test, the screws on the
clamping bracket have to be re-torqued once more,
as well as after 2-4 weeks of use.
In order for the under run protection to be valid, the
slide profiles must be 'fastened' in either of the fol
-
lowing ways:-
Eg. 1
Weld a lock plated (see diag.).
Eg. 2
Drill hole and screw in a locking nut/ bolt (se
diag.).
Installation of slide profiles
Position the lift under the trailer frame. Bring the lift
into position.
Adjust the slide profiles so it is in the centre of the
trailer chassis. Make sure there is no dirt between
slide bracket and I-beam during adjustment .
Place clamping brackets (6 pieces on each side) ac-
cording to the picture. Screw the lift securely with the
torques indicated.
Fit the support frame to the trailer chassis using the clamps.
Torque
180 Nm.
Working position lock
110
430
210