![ZCS TL Series User Manual Download Page 19](http://html1.mh-extra.com/html/zcs/tl-series/tl-series_user-manual_3222058019.webp)
19 / 74
Identificazione: MD-AL-GI-00
Rev. 4.0 del 31.01.18 - Applicazione: GID
Manual of 07/06/2019 Rev. 1.1 “User Manual for 20K-33KTL”
3.
Installation
General information in this chapter
This chapter describes how to install the 20K-33K TL inverter.
Installation notes:
DO NOT install 20K-33K TL inverters near flammable materials.
DO NOT install 20K-33K TL inverters in an area where flammable or explosive
materials are stored.
Danger
The housing and heat sink may become very hot while the inverter is running,
DO NOT install the inverter in places where they may be touched inadvertently.
Warning
Consider the weight of the inverter when handling and transporting the inverter.
Choose an appropriate mounting position and surface.
Assign at least two people to install the inverter.
Attention
3.1. Installation process
This section describes the process for installing the 20K-33K TL inverter
3.2. Checks before installation
This section describes the checks to carry out on the outer packaging, on the inverter and its
components.
3.3. Installation tools
This section describes the tools needed to install the inverter and to make the electrical connections
3.4. Installation position
This section describes the characteristics of the installation site of the inverter.
3.5. Moving the inverter
This section describes how to move the inverter to the installation position
3.6. Installing the inverter
This section describes the steps for installing the inverter on the wall