
1. INSTALLATION
2. INSTALLATION
Installing the base:
If holes cannot be drilled on the ground,the battery
expansion modules must be secured on the wall
Levelling instrument
Wall
Ground
Baseboard
60mm
10~25mm
Left
Right
A
Enlarged drawing A
M6
5 N·m
First Battery
PACK
Second Battery
PACK
Third Battery
PACK
Inverter
①
②
③
Step 1:
Place the base against a wall,
leaving a gap of 10-25 mm between the
base and the wall. Adjust the position of
the holes using a level and mark them
with a felt-tip pen.
Step 2:
To install the base, remove it, and
drill the holes using an impact drill with
an 8 mm diameter bit, drilling to a depth
of 60-65 mm. Tighten the expansion
screws to firmly secure the base in place.
Step 3:
Use a felt-tip pen to mark the
holes for attaching the battery modules
and inverters, following the dimensions
shown in the figure below.
Installing the modules:
Step 1:
Align the first battery
module to the base.
Step 2:
Install the connectors on
both sides and tighten the six
screws using a cross screwdriver.
Step 3:
Install the remaining
battery modules and inverter from
bottom to top. (Before installing the
next module, ensure that the
screws on the side connectors of
the previous module are firmly
tightened).
4