
PV panels
Critical Loads
Batteries
Activating the HYD3000-HYD6000-ZP1 inverter in off-grid mode allows it to supply power to the pre-
defined critical loads using energy from the PV system and stored in the batteries. To do this, it is
necessary to enable the EPS (Emergency Power Supply) mode.
Check that the DC circuit
breaker of the inverter is in
the OFF position.
1)
2)
Switch on the batteries:
Switch on the photovoltaic system by turning the switch to the ON
position.
3)
ON
18.1 OFF GRID MODE ONLY
18.2 OFF GRID MODE ONLY - START UP
*** Power output in EPS mode depends on the type of
batteries and the status of the system (e.g. no. of
batteries, residual capacity, temperature)
1) Set the disconnect switch to ON;
2) Press the button.
Once pressed, the button will light up and the internal contact will close.
1
2
30