2. Advanced settings
1. Battery parameters
3. Depth of discharge
✔
1.Basic settings
5. Select EPS mode
1.EPS control mode
1.Enable EPS mode
✔
1.Disable EPS mode
To enable the EPS (OFF-GRID) mode:
1. The EPS mode must be enabled from the display.
2. The following parameters must be set from the Depth of Discharge
menu.
During a
power outage
, the alternating voltage supplied by the grid will be lost. This condition will cause the
internal contacts of the hybrid inverter to switch over. Once the preset activation time has elapsed, the
inverter will continue to deliver a 230V alternating voltage to the LOAD output, supplying power only to
critical loads according to the availability of the batteries and PV system.
230V
0.00V
17.4 EPS MODE (OFF GRID) - MENU ENABLING
NOTE: with this configuration, the system operates as an IT system during a power
outage.
F
N
PE
F
N
PE