
-
(BAT +, BAT -)
of channel
BAT 1
of the
inverter
connected in parallel to
(B+, B-)
of
battery module 1
.
-
(B+, B-)
of
battery module 1
connected in parallel to
(B+, B-)
of
battery module 2
.
-
(BAT +, BAT -)
of channel
BAT 2
of the
inverter
connected in parallel to
(B+, B-)
of
battery module 3
.
-
(B+, B-)
of
battery module 3
connected in parallel to
(B+, B-)
of
battery module 4
.
1
1
2
3
- Connect the
grounding
cables as shown in the figure.
-
COM 1
of
inverter
→
Link Port IN
of
battery module 1
.
-
Link Port OUT
of
battery module 1
→
Link Port IN
of
battery module 2
.
- Insert the terminating resistor on
Link Port OUT
of
battery module 2
.
-
COM 1
of
inverter
→
Link Port IN
of
battery module 3
.
-
Link Port OUT
of
battery module 3
→
Link Port IN
of
battery module 4
.
- Insert the terminating resistor on
Link Port OUT
of
battery module 4
.
2
3
In case of 4 batteries, it is necessary to purchase the extension kit, code
ZZT-ZBT5K-EXT-KIT
.
BAT 1
BAT 2
BAT 3
BAT 4
BAT 1
BAT 2
BAT 3
BAT 4
R
R
BAT 1
BAT 2
BAT 3
BAT 4
R
R
BAT 1
BAT 2
BAT 3
BAT 4
BAT 1
BAT 2
BAT 3
BAT 4
BAT 1
BAT 2
BAT 3
BAT 4
12
Power connections up to 4 batteries (2 channels):
Communication connections up to 4 batteries (2 channels):