
1.1 Press the button to check
that the Meter address is set to
002
.
In addition to what is described above, the display shows the values of:
✓
Current;
✓
Voltage;
✓
Power factor;
✓
Power.
Address
Current
Power
Voltage
Power Factor
10.2.3 DDSU METER SETTING ON EXTERNAL PRODUCTION
2. No configurations are required on the inverter for the external production meter setting.
10.2.4 CONFIGURING DDSU EXCHANGE METER AND DDSU PRODUCTION METER
1.2 Production meter address setting:
Press and hold
for 5 sec to enter
settings menu
The protocol type
and the modbus
address will
alternate
As soon as the
screen with the
modbus address
number appears,
press the
arrow to increase
the number
PV panels
Meter
L
N
Grid
Loads
Exchange
meter
Inverter
PV panels
Production
meter
18