4. INSTALLATION
SYNTHESIS E
13
The Manufacturer cannot answer for damage caused by
ignoring these abovementioned norms as well as the information in
this manual.
4.8. Checking before starting work
After completing installation of the unit a series of checks must be carried
out, listed as follows:
-
check that the various disassembled parts have been assembled.
-
Check the power cable.
-
Check that the control panel is working.
-
Check that the apertures for ventilating the room are adequate.
-
If present, check that the ventilation hood is working
.
Summary of Contents for SYNTHESIS 12/80V E
Page 34: ......
Page 40: ...SYNTHESIS 12 80 VE C 1 N L1 L2 L3 IMPI0192 ...
Page 41: ...SYNTHESIS 12 80 VE C 2 ...
Page 42: ...SYNTHESIS 12 80 VE C 3 L1 L2 L3 IMPI0192 3 ...
Page 46: ...SYNTHESIS 12 80 VE ...
Page 47: ...SYNTHESIS 12 80 VE ...
Page 50: ...SYNTHESIS 12 80 VE ...
Page 51: ...SYNTHESIS 12 80 VE ...
Page 52: ......
Page 56: ...SYNTHESIS BM A B ...