6.1 When all of the tubing connections have
been completed, close the purge valve on the
front of the sampler probe body. Open the
sample probe supply valve to establish product
supply pressure to the probe body. Check all
connections for leaks.
6.2 Adjust the filter/regulator from the following
ranges:
6.3 Turn the stroke adjustment knob on the top
of the pump counterclockwise to set the pump
displacement at .4cc/stroke.
6.4 Move all of the mode switches on the Z-65
to their off positions.
6.5 Move both timer/counter dials to the 0
position (00 minutes).
6.6 Move mode switches 1, 2 and 3 to the on
position. The pump will begin stroking once
every 2 seconds in a diagnostic test mode.
6.7 Allow the sampler to operate until the
pipeline pressure plus 100 psi (6.9 Bar) is
achieved at sample discharge.
6.8 Return the mode switches to their off
positions.
6.9 Check all connections from the sampler
discharge to the connection on the sample
cylinder using a liquid leak detector.
6.10 If no leaks are found, the pump and tubing
should be considered tested and functional.
NOTE: black illustrates position of
switches.
Pipeline Pressure
Actuation Pressure
Under 700 psig (48.3 Bar)
45 psig (3.1 Bar)
700-1500 psig (48.3-103.4 Bar)
60 psig (4.1 Bar)
1500-2250 psig (103.4-155.1 Bar) 75 psig (5.2 Bar)
Mutual
System
Approved
Factory
6. Operational Check & Leak Testing: