2 8
y t
2.2 a //
Remove the cable ties using a wire cutter.
2.2 b //
Remove the stem screws grease the threads and put
them aside (Allen key 4 mm).
2.2 c //
Put the screws in the handlebar clamps and attach
them to the stem (Allen key 4 mm). Please make sure
the handlebar clamps are aligned correctly.
2.2 d //
Tighten the lower screws first.
2.2 e //
Tighten the handlebar clamps with the correct
torque before starting to tighten the upper screws. Make
sure there is no gap left (zero gap).
2.2 f //
Make sure the clamp gap of the upper screws
is even and the handlebar is centered and inserted
correctly. The adjustment lines will help you with this.
The torque of the screws should fit the handlebar
and / or stem manufacturer´s guidelines.
2 . 2
HANDLEBAR ASSEMBLY – RENTHAL FATBAR CARBON 35
C
d
e
a
b
F
Summary of Contents for RTFM JEFFSY
Page 1: ...read first then unpack Zuerst lesen dann auspacken D abord lire ENSUITE DEBALLER...
Page 14: ...14 yt It s done...
Page 15: ...yt 15 DE bevor es losgeht gibt s hier noch Infos zur Einstellung und pflege deines Bikes...
Page 24: ...24 yt...
Page 34: ...34 yt It s done...
Page 35: ...yt 35 EN before you go out and ride here s a few words on your bike set up and maintenance...
Page 44: ...44 yt...
Page 54: ...54 yt c est fait...