Install DO Membrane
A new membrane cap must be installed before the first
use
.
• Unscrew and remove the probe sensor guard.
• Unscrew, remove, and discard the old membrane cap.
• Thoroughly rinse the sensor tip with distilled water.
• Prepare the electrolyte according to the directions on the
electrolyte solution bottle.
• Hold the new membrane cap and fill it at least 1/2 full with the
electrolyte solution.
• Screw the membrane cap onto the sensor moderately tight. A
small amount of electrolyte should overflow.
Summary of Contents for YSI 556 MPS
Page 1: ...YSI 556 MPS Set up Operation Calibration...
Page 5: ...YSI 556 MPS SET UP...
Page 13: ...YSI 556 MPS SENSORS...
Page 19: ...View all Parameters...
Page 20: ...YSI 556 MPS CALIBRATION...
Page 35: ...YSI 556 MPS RUN...
Page 37: ...YSI 556 MPS FILE...
Page 45: ...YSI 556 MPS LOGGING...
Page 52: ...YSI 556 MPS SYSTEM SET UP...
Page 55: ...YSI 556 MPS MAINTENANCE...
Page 64: ...YSI 556 MPS STORAGE...
Page 68: ...Please visit the YSI website on WWW YSI COM Thank you...