FORM 160.55-O1 (920)
3
YORK INTERNATIONAL
CHANGEABILITY OF THIS DOCUMENT
In complying with Johnson Controls’ policy for contin-
uous product improvement, the information contained
in this document is subject to change without notice.
Johnson Controls makes no commitment to update
or provide current information automatically to the
manual or product owner. Updated manuals, if appli-
cable, can be obtained by contacting the nearest John-
son Controls Service office or accessing the Johnson
Controls Knowledge Exchange website at
It is the responsibility of rigging, lifting, and operating/
service personnel to verify the applicability of these
documents to the equipment. If there is any question
regarding the applicability of these documents, rig-
ging, lifting, and operating/service personnel should
verify whether the equipment has been modified and
if current literature is available from the owner of the
equipment prior to performing any work on the chiller.
ASSOCIATED LITERATURE
MANUAL DESCRIPTION
FORM NUMBER
SOLID STATE STARTER (MOD “A”) – OPERATION & MAINTENANCE
160.46-OM3.1
SOLID STATE STARTER (MOD “B”) – OPERATION & MAINTENANCE
160.00-O2
VARIABLE SPEED DRIVE – OPERATION
160.00-O1
INSTALLATION
160.55-N1
WIRING DIAGRAM – UNIT WITH ELECTRO-MECHANICAL STARTER
160.55-PW1
WIRING DIAGRAM – UNIT WITH SOLID STATE STARTER (MOD “B”)
160.55-PW2
WIRING DIAGRAM – UNIT WITH VARIABLE SPEED DRIVE
160.55-PW3
RENEWAL PARTS – UNIT
160.48-RP5
RENEWAL PARTS – GRAPHIC CONTROL CENTER
160.55-RP1
AFFECTED PAGES
DESCRIPTION
3
Associated Literature table updated
3
Conditioned Based Maintenance program information added
REVISION NOTES
Revisions made to this document are indicated in the following table. These revisions are to technical information,
and any other changes in spelling, grammar, or formatting are not included.
CONDITIONED BASED MAINTENANCE
Traditional chiller maintenance is based upon assumed
and generalized conditions. In lieu of the tradition-
al maintenance program, a Johnson Controls YORK
Conditioned Based Maintenance (CBM) program can
be substituted. This CBM service plan is built around
the specific needs for the chiller, operating conditions,
and annualized impact realized by the chiller. Your lo-
cal Johnson Controls Branch can propose a customized
Planned Service Agreement that leverages real time
and historical data, delivering performance reporting,
corrective actions required and data enabled guidance
for optimal operation and lifecycle assurance. The pro-
gram will include fault detection diagnostics, operation
code statistics, performance based algorithms and ad-
vance rules based rationale delivered by the Johnson
Controls Connected Equipment Portal.