INDOOR UNIT
INSTALLATION PROCEDURE
8
First make changes to wall and make sure that is hard and secure. Using four “ + ” type screws to fasten the installation
board onto wall. Keep it horizontal direction and perpendicular in vertical direction. Otherwise it might cause water
drops when the air-conditioner is running at cooling operation.
Indoor
Outdoor
15mm
Ring
Putty
Pipe connection
70mm
ĭ
Drill a pipe hole of 70mm in diameter at the left down or right down side of the installation board. The hole shall slant
outward slightly.
Water discharge pipe
Connection wire
Hang the indoor unit to the board and make sure the machine is in the middle of the board.
Push the machine to wards the left down and right down side of the installation board until the hangers enters tightly
the grooves ( it produces “ Click ” sound )
Bolt
Vertical airflow
direction plate
Bolt
Front frame
Pull down the front frame to wards your
and take off front frame.
Check the water drainage
1. Take the frame off the unit cover.
Take off the front frame for maintenance
according to the following steps:
Turn perpendicular airflow direction
handle from “ I ” to horizontal direction.
Take the two cover soff the front frame
and then unfasten the two fix tures screws
as shown inthe picture in the right.
Pull the front frame to wards yourself and take
it off.
You should check whether the front frame is firmly
inside the fixture groove on the top.
2. Check the water discharge
Verification of condensate water drainage.
Fill the drain panwith waterand observe
evacuation