62
YORK INTERNATIONAL
UNIT ON/OFF SWITCH
A master UNIT ON/OFF switch is located on the keypad.
This rocker switch allows the operator to turn the entire
chiller OFF if desired. The switch must be placed in the
ON position for the chiller to operate.
Whenever the switch is placed in the OFF position, a
STATUS display indicating the condition will be dis-
played. This message is shown below.
SYSTEM SWITCHES
SYSTEM SWITCHES 1 - 4 are located on the Microproc-
essor Board (See Fig. 22). These allow the operator to
selectively turn a given system on or off as desired. On a
2 system chiller, switches 3 & 4 should be OFF. The
System Switch for a designated system must be ON
(Switch to right) for the system to operate.
Whenever a switch is placed in the OFF position, a STA-
TUS display indicating the condition will be displayed
indicating that the system does not have a Run Permis-
sive signal. A sample of this message is shown below.
NOTE: This message will not appear if Anti-recycle or
Anti-coincident timers are in effect and are be-
ing displayed.
UNIT ON/OFF SWITCH
UNIT
ON/OFF SWITCH
26572A(D)
ALARM CONTACTS (ANNUNCIATION ALARM)
Dry contacts connected to terminals 23 and 24 (Fig.
23) are supplied, which will transition to function as a
warning whenever a fault shutdown occurs on any sys-
tem or if power is lost to the control panel. The dry con-
tacts are normally open (N.O.) and will close when con-
trol power is applied to the panel, if no fault conditions
are present. If power is not lost or a fault lockout occurs,
the contact will open.
A 28VDC or 120VAC external alarm circuit (by others)
may be wired into the YORK supplied alarm contacts.
Any inductive load devices (relay, contactor), supplied
by the user which are connected to the dry contacts,
MUST be suppressed at the load. Use YORK P/N
031-00808-000 suppressor (not supplied). Failure to do
this will result in nuisance faults and possible damage to
the chiller.
CAUTION: If the alarm circuit is applied in an applica-
tion used for critical duty (such as process
duty or cooling other critical equipment) and
the alarm circuit should fail to function,
YORK will not be liable for damages.
LEAD/LAG COMPRESSOR SELECTION
The chiller can be set up for AUTO or MANUAL Lead/
Lag. This is accomplished by configuring the S1 Dip
Switches properly on the Microprocessor Board. Details
for doing this are discussed in the OPTIONS key sec-
tion.
U N I T
S W I T C H
I S
I N
T H E
O F F
P O S I T I O N
S Y S # 1
N O
R U N
P E R M
S Y S # 2
N O
R U N
P E R M
Summary of Contents for YCAJ44HE8
Page 16: ...16 YORK INTERNATIONAL WIRING DIAGRAMS LD02165 FIG 5 ELEMENTARY DIAGRAM...
Page 17: ...FORM 150 60 NM3 17 YORK INTERNATIONAL FIG 5 ELEMENTARY DIAGRAM Cont d LD02166...
Page 20: ...20 YORK INTERNATIONAL CONNECTION DIAGRAM ELECTRICAL BOX FIG 7 CONNECTION DIAGRAM LD02171...
Page 21: ...FORM 150 60 NM3 21 YORK INTERNATIONAL FIG 7 CONNECTION DIAGRAM Cont d LD02172...