
69
GLOBAL
INDUSTRIES, INC.
M36 - M48 Bucket Elevator
10230004
2015-08-31
NOTE:
The examples
on
this page
and
the next page
show the configuration for a right hand setup. Reverse
the components for a left hand unit.
NOTE:
Make certain to build the platform as shown on
the previous page
.
Assembly
PLATFORM
UPRIGHT POST
RAIL
RAIL
a) Outer Corner Assembly
RAIL
RAIL
PLATFORM
UPRIGHT POST
c) Inner Corner Assembly
NOTE:
Bolt and weld all platform kicker braces on all
platforms to the leg and platform.
35 1/4” [895 mm]
39 1/4” [997 mm]
48 5/8”
[1,235 mm]
20”
[508 mm]
94 1/2”
[2,400 mm]
138 5/8”
[3,521 mm]
39 1/4” [997 mm]
DOWN LEG
UP LEG
Right Hand Drive
b) M48 20” x 14” Distributor Platform Dimensions
KICKER BRACE
48 5/8”
[1,235 mm]
39 1/4” [997 mm]
39 1/4” [997 mm]
30”
[762 mm]
108 1/2” [2,756 mm]
138 5/8”
[3,521 mm]
39 1/4” [997 mm]
DOWN LEG
UP LEG
Right Hand Drive
d) M48 30” x 14” Distributor Platform Dimensions
KICKER BRACE