59
Hang the panel to the hooks on the mainbody.
Tighten the screws under the panel hooks till
the panel closely stick on the ceiling to avoid
condensate water.
Hang the air-in grill to the panel, then connect
the lead terminator of the swing motor and that
of the control box with corresponding
terminators on the body respectively.
Note: The panel shall be installed after the
wiring connected.
13.2.3
Ceiling-floor unit installation
13.2.3.1 Service space for indoor unit
13.2.3.2 Bolt pitch
①
Ceiling installation
Capacity (Btu/h)
D
E
18K / 24K
mm
983
220
inch 38.70 8.66
②
Wall-mounted installation
13.2.3.3 Install the pendant bolt
①
Ceiling installation
Summary of Contents for HP Series
Page 8: ...5 2 2 Part names of Indoor Outdoor units Cassette Units...
Page 9: ...6...
Page 10: ...7 Ceiling floor Units...
Page 14: ...11 2 3 2 7 Outside Water Pump for Optional When Ceiling Installation...
Page 24: ...21 Ceiling floor Units...
Page 28: ...25 YFKE18BXTMCM RX YFJE18BXTMCM RX YFKE24BXTMCM RX YFJE24BXTMCM RX...
Page 43: ...40 6 2 Outdoor Unit YUKE18BYTMCMO X YUJE18BYTMCMO X YUKE24BYTMCMO X YUJE24BYTMCMO X...
Page 44: ...41 YUKE12BYTMCMO X YUJE12BYTMCMO X...
Page 57: ...54 12 Field Wiring 9K 24K...
Page 104: ...101 P U P V...
Page 105: ...102 P W P N...
Page 108: ...105 High temperature protection of IPM board diagnosis and solution P2...
Page 115: ...112 16 4 16 J4 Malfunction...
Page 119: ...116...