Assembly
30
GLOBAL
INDUSTRIES, INC.
Drag Conveyors
10230011
2016-06-14
INTERMEDIATE
SECTION
CHAIN GUIDES
CAULKING
HEAD
BOTTOM SPLICE
3/8” x 1” BOLT,
typical
2” [51 mm]
offset
Head
I
head to intermediate section
Remove the head and fi rst intermediate section
covers. Remove the head chain guides. Bolt
together the head and fi rst intermediate section
as shown (example below). Re-attach the
chain guides near the head top to provide a
smooth transition for the chain return. Install
the bottom splice.
3