02-4001-09 | Effective Date: May 29, 2018
Page-28
YES 45 FS/FI Storefront System
GLAZING
Glazing
Gasket
Apply Sealant
To Horizontal
Gasket Ends
Glazing
Gasket
Tool Sealant at
Gasket Corners
Install horizontal glazing gaskets next:
-Cut horizontal glazing gaskets to Daylight Opening plus(+) 3/16” for each foot of length.
-Apply sealant to each end of the horizontal glazing gasket prior to inserting into the reglet.
-Insert the gasket into the reglet at each end first and push each end tight against the
vertical gasket.
-Then insert the gasket at the midpoint of the opening and push the gasket into the reglet
starting at the midpoint and work towards each end.
-Tool the excess sealant at the gasket corners to ensure a watertight seal.
See
Detail 33
.
Detail 33
YES 45 FI
With 1” Glazing Shown
Other Systems Similar
STEP 18
INSTALL INTERIOR GLAZING GASKETS
The interior glazing gaskets must be installed prior to the glazing process.
-Using a small brush clean out any dirt that may have accumulated in the gasket reglets.
Vertical glazing gaskets must be installed first:
-Cut vertical glazing gaskets to Daylight Opening plus(+) 3/16” for each foot of length.
-Insert the gasket into the reglet at each end first, and then insert the gasket at the
midpoint of the opening.
-Push the gasket into the reglet starting at the midpoint and work towards each end.
Summary of Contents for YES 45 FS
Page 2: ......
Page 35: ......
Page 36: ...YKK AP America Inc 270 Riverside Parkway Suite 100 Austell Georgia 30168 www ykkap com...