DOCR-070645-E
Page 89 of 102
Fault0020
(Bus over volt
Hardware)
1. Restart inverter by recycle both AC and DC switches.
Wait for 1 minute between OFF and ON for all energy to
discharge.
2. Contact after-sales service personnel if the error
persists
Fault0150
(Open-loop self-check
failure)
1. Restart inverter by recycle both AC and DC switches.
Wait for 1 minute between OFF and ON for all energy to
discharge.
2. Contact after-sales service personnel if the error
persists
INSTRUCTION:
*The actual display of “PV.VoltOver” is “PV1VoltOver” or “PV2VoltOver”
or “PV3VoltOver”.
*The actual display of “PV.Reverse” is “PV1Reverse” or “PV2Reverse” or
“PV3Reverse”.
DANGER:
Please disconnect the inverter from AC grid and PV modules before
opening the equipment. Make sure hazardous high voltage and energy
inside the equipment has been discharged.
Do not work in the inverter until at least 5 minutes after disconnecting
all sources of DC and AC.
Veuillez débrancher l'onduleur du grid C.A. et des modules
photovoltaiques avant l'ouverture de l'équipement. Assurez-vous que la
haute tension et l'énergie dangereuses à l'intérieur de l'équipement a été
déchargée.
Ne pas utiliser ou entretenir l'onduleur jusqu'à au moins 5 minutes après
avoir débranché toutes les sources du côté C.C. et C.A